Yiannis Place | Apartment in Tolo
9 Bedroom Apartment in Tolo
Yiannis Place offers accommodations in Tolo, a 6-minute walk from Tolo Beach and 6.5 miles from Bourtzi. With sea views, this accommodation features a swimming pool. The apartment provides rooms with air conditioning, free private parking, and free Wifi. Each unit comes with a sofa, a seating area, a flat-screen TV, a well-equipped kitchen, and a private bathroom with a hair dryer. A fridge and stovetop are also provided, as well as a coffee machine and a kettle. The rooms are equipped with heating facilities. There is a snack bar and bar. Palamidi is 7.2 miles from the apartment, while Akronafplia Castle is 7.3 miles away. Kalamata International Airport is 93 miles from the property.
Yiannis Place is located in Tolo.
This 9 Bedrooms Apartment is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Air Conditioner, Balcony/Terrace, Transportation/Shuttle, and several others. This is a 3 star rated property and has over 31 reviews with the average score of 9.8 . Coming to Tolo and needing a place to stay? Be it for work or for leisure, consider staying at this Apartment for your next visit, you will surely love it.
You can check the reviews and description of this 9 Bedrooms Apartment if you want to learn more about this place in Tolo. These details are authentic, as they are provided by our partner, booking.com.
This Yiannis Place in Tolo is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Yiannis Place”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Apartment, please let us know.
Amenities
Facility Overview
-
Bar
-
Snack bar
-
Free parking
-
Parking
-
Private Parking
-
Parking on site
-
Wifi in all areas
-
Adults only
-
Non-smoking rooms
-
Air conditioning
-
Heating
-
Smoke-free property
-
Ironing service
-
Airport shuttle
-
Express check-in/out
-
Invoice provided
-
Wifi
-
Internet
-
Free Wifi
-
Outdoor furniture
-
Outdoor pool
-
Staff follow all safety protocols as directed by local authorities
-
Cashless payment available
-
Physical distancing rules followed
-
Property cleaned by professional cleaning companies
-
Saltwater pool
-
Swimming pool
Policies
Please inform of your expected arrival time in advance. you can use the special requests box when booking, or contact the property directly using the contact details in your confirmation.
Reviews
Room Arrangement
| Room Info | Facilities |
|---|---|
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
36 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetOutdoorsOutdoor furniture, Terrace, Outdoor dining areaRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
35 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetOutdoorsOutdoor furniture, Terrace, Outdoor dining areaRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
33 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetOutdoorsOutdoor furniture, Terrace, Outdoor dining areaRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
36 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingOutdoorsBalcony, Outdoor furniture, Outdoor dining areaKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
33 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingOutdoorsBalcony, Outdoor furniture, Outdoor dining areaKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
24 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingOutdoorsBalcony, Outdoor furniture, Outdoor dining areaKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetRoom amenitiesSofa bedPool and SpaPool towels |
|
One-Bedroom Apartment
Room Type:
Apartment
Room Size:
24 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingOutdoorsBalcony, Outdoor furniture, Outdoor dining areaKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetRoom amenitiesSofa bedPool and SpaPool towels |
|
Two-Bedroom Apartment
Room Type:
Apartment
Room Size:
47 m2
|
BathroomHairdryer, Toilet paper, Shower, Private bathroomMedia & TechnologyTV, Flat-screen TVGeneralIron, Ironing facilities, Trash cans, Air conditioning, HeatingOutdoorsBalcony, Outdoor furniture, Outdoor dining areaKitchenCoffee machine, Electric kettle, Stovetop, Dining table, Refrigerator, KitchenLiving AreaSofa, Sitting areaViewSea view, View, Garden view, City viewBedroomWardrobe or closetRoom amenitiesSofa bedPool and SpaPool towels |
FAQ's
Is this property pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
What time is check-in & check-out at property?
Check-in time for Yiannis Place starts counting from 3:00 PM and check-out is until 10:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.
Does the property have a swimming pool?
Yes, this Yiannis Place has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in property?
Best-rates for the Yiannis Place starts from $135 per night with includes Internet, Air Conditioner, Balcony/Terrace, Transportation/Shuttle, Security/Safety, Bar, Guest Services, Laundry, Parking, Pool, Fireplace/Heating with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is property a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is not considered to be a family-friendly property. As reported by the owner or manager, the apartment has not specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the property wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Yiannis Place has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the property?
Based on the information reported by the owner or manager, the Yiannis Place indicates 1 day stay policy at this apartment. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for property?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.